Query
Paint Brush PV4
Type
Entity Briefing
Entity
Paint Brush PV4
Generated
2026-10-20T03:15:53.794Z

Briefing on Paint Brush PV4

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
252 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2032-10-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Paint Brush PV4 is a 252 MW Solar project in Texas, currently active.

Renew Development HoldCo LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2032-10-15.

Queue ID
ERCOT-29INR0221
Location
Coleman, Texas
Technology
Solar
Developer
Renew Development HoldCo LLC
Market / region
ERCOT
Point of interconnection
Tap 345 1444 Brown Switch – 60040 Bluff Creek Switch

What stands out

1

Paint Brush PV4 is a 252 MW Solar project in Texas with status active.

2

Renew Development HoldCo LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2032-10-15.

Market and operating context

Queue date
2025-12-02
Proposed COD
2032-10-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Paint Brush PV4 — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0221
LocationColeman, Texas
TechnologySolar
DeveloperRenew Development HoldCo LLC
Market / regionERCOT
Point of interconnectionTap 345 1444 Brown Switch – 60040 Bluff Creek Switch
Queue date2025-12-02
Proposed COD2032-10-15