Query
Padua 3
Type
Entity Briefing
Entity
Padua 3
Generated
2026-10-18T09:48:08.707Z

Briefing on Padua 3

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
200 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Padua 3 is a 200 MW Batteries asset in ERCOT (Texas), currently Under construction.

Padua 3 is reported in Texas under Padua 3. Available operating and financial measures include $1361/kW reported CapEx.

Location
Bexar, Texas
Technology
Batteries
Owner / parent
Padua 3
Operator
Padua 3
Grid
ERCOT (Texas)
Plant ID
68914

What stands out

1

Padua 3 is a 200 MW Batteries asset in Texas with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

1 linked queue projects represent 201 MW of proposed capacity.

4

Latest linked story: “Eolian Secures $463M Financing for Texas’ Largest Battery Storage Project, Padua 2 & 3” (SolarQuarter, 2025-10-09).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#70 of 344
National rank
#192 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Padua 3 — verified asset snapshot

FieldValue
LocationBexar, Texas
TechnologyBatteries
Owner / parentPadua 3
OperatorPadua 3
GridERCOT (Texas)
Plant ID68914
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.