Padua 1 is a 50 MW Batteries asset in ERCOT (Texas), currently Operating.
Padua 1 is reported in Texas since 2025 under Padua 1. Available operating and financial measures include -1.2% capacity factor and -3 GWh annual generation; $1361/kW reported CapEx.
- Location
- Bexar, Texas
- Technology
- Batteries
- Owner / parent
- Padua 1
- Operator
- Padua 1
- Grid
- ERCOT (Texas)
- Plant ID
- 68912
What stands out
Padua 1 is a 50 MW Batteries asset in Texas with status Operating.
Latest annual operating measures report -1.2% capacity factor and -3 GWh annual generation.
Available financial measures include $1361/kW CapEx.
Latest linked story: “Eolian Secures $463M Financing for Texas’ Largest Battery Storage Project, Padua 2 & 3” (SolarQuarter, 2025-10-09).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #193 of 344
- National rank
- #463 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.