Query
P66 Rodeo Solar
Type
Entity Briefing
Entity
P66 Rodeo Solar
Technology
solar
Generated
2026-10-09T16:21:15.131Z

Briefing on P66 Rodeo Solar

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
30 MW
Capacity
Operating
Current status
2023
Operating since
1
Generators
20.9%
Capacity factor
42 GWh
Annual generation
Briefing/plantOperating

P66 Rodeo Solar is a 30 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

P66 Rodeo Solar is reported in California since 2023 under P66 Rodeo Solar. Available operating and financial measures include 20.9% capacity factor and 42 GWh annual generation.

Location
Contra Costa, California
Technology
Solar Photovoltaic
Owner / parent
P66 Rodeo Solar
Operator
P66 Rodeo Solar
Grid
CAISO (California)
Plant ID
68890

What stands out

1

P66 Rodeo Solar is a 30 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 20.9% capacity factor and 42 GWh annual generation.

3

Latest linked story: “Phillips 66 and NextEra Energy Resources begin commercial operations at Rodeo Renewable Energy Complex solar facility” (Phillips 66, 2025-05-08).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#168 of 992
National rank
#1572 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.