Briefing/projectsuspended
Owego Solar is a 74 MW Solar project in Texas, currently suspended.
Hecate Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2020-12-31.
- Queue ID
- ERCOT-16INR0102
- Location
- Pecos, Texas
- Technology
- Solar
- Developer
- Hecate Energy
- Market / region
- ERCOT
- Point of interconnection
- 6601 Rio Pecos 138kV
What stands out
1
Owego Solar is a 74 MW Solar project in Texas with status suspended.
2
Hecate Energy is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2020-12-31.
4
Latest linked story: “17 large-scale solar projects planned in Upstate New York” (Solar Power World, 2020-03-13).
Market and operating context
- Queue date
- 2015-04-06
- Proposed COD
- 2020-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.