Query
Owego Solar
Type
Entity Briefing
Entity
Owego Solar
State
OR
Generated
2026-10-19T23:47:52.428Z

Briefing on Owego Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
74 MW
Proposed capacity
suspended
Current status
Solar
Technology
ERCOT
Market / region
2020-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectsuspended

Owego Solar is a 74 MW Solar project in Texas, currently suspended.

Hecate Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2020-12-31.

Queue ID
ERCOT-16INR0102
Location
Pecos, Texas
Technology
Solar
Developer
Hecate Energy
Market / region
ERCOT
Point of interconnection
6601 Rio Pecos 138kV

What stands out

1

Owego Solar is a 74 MW Solar project in Texas with status suspended.

2

Hecate Energy is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2020-12-31.

4

Latest linked story: “17 large-scale solar projects planned in Upstate New York” (Solar Power World, 2020-03-13).

Market and operating context

Queue date
2015-04-06
Proposed COD
2020-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Owego Solar — verified asset snapshot

FieldValue
Queue IDERCOT-16INR0102
LocationPecos, Texas
TechnologySolar
DeveloperHecate Energy
Market / regionERCOT
Point of interconnection6601 Rio Pecos 138kV
Queue date2015-04-06
Proposed COD2020-12-31