Briefing/projectactive
Ouroboros Grid BESS 5 is a 201 MW Battery project in Texas, currently active.
Ouroboros Grid BESS Unit 5 is the reported developer. Proposed COD is 2028-06-01.
- Queue ID
- ERCOT-28INR0428
- Location
- Cameron, Texas
- Technology
- Battery
- Developer
- Ouroboros Grid BESS Unit 5
- Market / region
- ERCOT
- Point of interconnection
- 79500 Palmito 345KV
What stands out
1
Ouroboros Grid BESS 5 is a 201 MW Battery project in Texas with status active.
2
Ouroboros Grid BESS Unit 5 is the reported developer.
3
proposed COD is 2028-06-01.
Market and operating context
- Queue date
- 2025-08-18
- Proposed COD
- 2028-06-01
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.