Query
Ouroboros Grid BESS 1
Type
Entity Briefing
Entity
Ouroboros Grid BESS 1
ISO/RTO
ercot
Technology
battery
Generated
2026-10-19T22:46:15.618Z

Briefing on Ouroboros Grid BESS 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-06-01
Proposed COD
Briefing/projectactive

Ouroboros Grid BESS 1 is a 201 MW Battery project in Texas, currently active.

Ouroboros Grid BESS Unit 1 is the reported developer. Proposed COD is 2028-06-01.

Queue ID
ERCOT-28INR0397
Location
Cameron, Texas
Technology
Battery
Developer
Ouroboros Grid BESS Unit 1
Market / region
ERCOT
Point of interconnection
POIB: #88337 Chalybe 345 kV (expansion of the #8735 Chalybe 138 kV – to be connected by double circuit line to #79500 Palmito 345 kV)

What stands out

1

Ouroboros Grid BESS 1 is a 201 MW Battery project in Texas with status active.

2

Ouroboros Grid BESS Unit 1 is the reported developer.

3

proposed COD is 2028-06-01.

Market and operating context

Queue date
2025-07-29
Proposed COD
2028-06-01

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Ouroboros Grid BESS 1 — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0397
LocationCameron, Texas
TechnologyBattery
DeveloperOuroboros Grid BESS Unit 1
Market / regionERCOT
Point of interconnectionPOIB: #88337 Chalybe 345 kV (expansion of the #8735 Chalybe 138 kV – to be connected by double circuit line to #79500 Palmito 345 kV)
Queue date2025-07-29
Proposed COD2028-06-01