Query
ORLEANS
Type
Entity Briefing
Entity
ORLEANS
Generated
2026-10-12T01:47:26.883Z

Briefing on ORLEANS

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
51 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2029-08-03
Proposed COD
C14
Queue phase
Briefing/projectactive

ORLEANS is a 51 MW Solar+Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2029-08-03.

Queue ID
CAISO-1966
Location
Fresno, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Giffen 70 kV

What stands out

1

ORLEANS is a 51 MW Solar+Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2029-08-03.

3

Latest linked story: “Savion flips switch on 100-MW Oklahoma solar project” (Solar Power World, 2025-03-06).

Market and operating context

Queue date
2021-04-15
Proposed COD
2029-08-03
IA status
IA Executed
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

ORLEANS — verified asset snapshot

FieldValue
Queue IDCAISO-1966
LocationFresno, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionGiffen 70 kV
Queue date2021-04-15
Proposed COD2029-08-03
IA statusIA Executed