Query
Oriole BES
Type
Entity Briefing
Entity
Oriole BES
Generated
2026-10-06T12:30:59.104Z

Briefing on Oriole BES

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-29
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Oriole BES is a 150 MW Solar+Battery project in Texas, currently active.

Rolling Plains Solar is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-29.

Queue ID
ERCOT-28INR0009
Location
Knox, Texas
Technology
Solar+Battery
Developer
Rolling Plains Solar
Market / region
ERCOT
Point of interconnection
Tap 345kV 6076 Foxtail - 60791 Perigee

What stands out

1

Oriole BES is a 150 MW Solar+Battery project in Texas with status active.

2

Rolling Plains Solar is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-29.

Market and operating context

Queue date
2023-05-15
Proposed COD
2028-12-29
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Oriole BES — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0009
LocationKnox, Texas
TechnologySolar+Battery
DeveloperRolling Plains Solar
Market / regionERCOT
Point of interconnectionTap 345kV 6076 Foxtail - 60791 Perigee
Queue date2023-05-15
Proposed COD2028-12-29