Query
Oregon University System OIT Klamath Fal
Type
Entity Briefing
Entity
Oregon University System OIT Klamath Fal
State
OR
Generated
2026-10-18T14:14:07.559Z

Briefing on Oregon University System OIT Klamath Fal

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2014
Operating since
1
Generators
16.8%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

Oregon University System OIT Klamath Fal is a 2 MW Solar Photovoltaic asset in Oregon, currently Operating.

Oregon University System OIT Klamath Fal is reported in Oregon since 2014 under Tesla Inc.. Available operating and financial measures include 16.8% capacity factor and 3 GWh annual generation; $29.0/MWh reported energy value.

Location
Klamath, Oregon
Technology
Solar Photovoltaic
Owner / parent
Tesla Inc.
Operator
Tesla Inc.
Grid
PacifiCorp - West
Plant ID
58961

What stands out

1

Oregon University System OIT Klamath Fal is a 2 MW Solar Photovoltaic asset in Oregon with status Operating.

2

Latest annual operating measures report 16.8% capacity factor and 3 GWh annual generation.

3

Available financial measures include $29.0/MWh energy value.

Market and operating context

Balancing authority
PacifiCorp - West
NERC region
WECC
State rank
#145 of 156
National rank
#6373 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.