Orchard Park is a 24 MW Natural Gas Internal Combustion Engine asset in PJM Interconnection, currently Operating.
Orchard Park is reported in Pennsylvania since 2003 under Borough of Chambersburg - (PA). Available operating and financial measures include 23.7% capacity factor and 50 GWh annual generation; $965/kW reported CapEx.
- Location
- Franklin, Pennsylvania
- Technology
- Natural Gas Internal Combustion Engine
- Owner / parent
- Borough of Chambersburg - (PA)
- Operator
- Borough of Chambersburg - (PA)
- Grid
- PJM Interconnection
- Plant ID
- 55997
What stands out
Orchard Park is a 24 MW Natural Gas Internal Combustion Engine asset in Pennsylvania with status Operating.
Latest annual operating measures report 23.7% capacity factor and 50 GWh annual generation.
Available financial measures include $965/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #48 of 70
- National rank
- #1322 of 2,025
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.