Orange County Advanced Power Station is a 1.3 GW Natural Gas Fired Combined Cycle asset in MISO (Midcontinent), currently Under construction.
Orange County Advanced Power Station is reported in Texas under Entergy. Available operating and financial measures include $782/kW reported CapEx.
- Location
- Orange, Texas
- Technology
- Natural Gas Fired Combined Cycle
- Owner / parent
- Entergy
- Operator
- Entergy Texas Inc.
- Grid
- MISO (Midcontinent)
- Plant ID
- 66621
What stands out
Orange County Advanced Power Station is a 1.3 GW Natural Gas Fired Combined Cycle asset in Texas with status Under construction.
Available financial measures include $782/kW CapEx.
Latest linked story: “Entergy Texas’ Orange County Advanced Power Station achieves ‘first fire’ milestone” (Entergy, 2026-04-28).
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- SERC
- State rank
- #10 of 325
- National rank
- #90 of 2,025
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.