Briefing/plantOperating
Olney is a 20 MW Batteries asset in ERCOT (Texas), currently Operating.
Olney is reported in Texas since 2023 under Hunt Energy. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $1361/kW reported CapEx.
- Location
- Young, Texas
- Technology
- Batteries, Petroleum Liquids
- Owner / parent
- Hunt Energy
- Operator
- HEN Infrastructure, L.L.C.
- Grid
- ERCOT (Texas)
- Plant ID
- 65832
What stands out
1
Olney is a 20 MW Batteries asset in Texas with status Operating.
2
Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.
3
Available financial measures include $1361/kW CapEx.
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #4 of 30
- National rank
- #155 of 825
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.