Query
Olney
Type
Entity Briefing
Entity
Olney
Generated
2026-10-19T21:34:50.539Z

Briefing on Olney

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
20 MW
Capacity
Operating
Current status
2023
Operating since
2
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

Olney is a 20 MW Batteries asset in ERCOT (Texas), currently Operating.

Olney is reported in Texas since 2023 under Hunt Energy. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $1361/kW reported CapEx.

Location
Young, Texas
Technology
Batteries, Petroleum Liquids
Owner / parent
Hunt Energy
Operator
HEN Infrastructure, L.L.C.
Grid
ERCOT (Texas)
Plant ID
65832

What stands out

1

Olney is a 20 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#4 of 30
National rank
#155 of 825

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.