Oliver Wind IV is a 199 MW Onshore Wind Turbine asset in SPP (Southwest Power Pool), currently Operating.
Oliver Wind IV is reported in North Dakota since 2024 under Oliver Wind IV, LLC. Available operating and financial measures include 45.9% capacity factor and 799 GWh annual generation; $1758/kW reported CapEx.
- Location
- Oliver, North Dakota
- Technology
- Onshore Wind Turbine
- Owner / parent
- Oliver Wind IV, LLC
- Operator
- Oliver Wind IV, LLC
- Grid
- SPP (Southwest Power Pool)
- Plant ID
- 67502
What stands out
Oliver Wind IV is a 199 MW Onshore Wind Turbine asset in North Dakota with status Operating.
Latest annual operating measures report 45.9% capacity factor and 799 GWh annual generation.
Available financial measures include $1758/kW CapEx.
Latest linked story: “ND Public Service Commission approves permit for wind farm in Oliver County” (KFYR-TV, 2024-04-30).
Market and operating context
- ISO / market
- SPP (Southwest Power Pool)
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
- State rank
- #11 of 45
- National rank
- #382 of 1,442
Why it matters
For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.