Query
Oliver
Type
Entity Briefing
Entity
Oliver
Summary generated
Oct 10, 2026
First saved
Date not recorded

Briefing on Oliver

Entity Briefing

Summary generated Oct 10, 2026 (UTC).

Source dates used by this summary were not recorded.

14 MW
Capacity
Operating
Current status
1970
Operating since
5
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

Oliver is a 14 MW Petroleum Liquids asset in MISO (Midcontinent), currently Operating.

Oliver is reported in Michigan since 1970 under DTE Energy. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $154/kW reported CapEx.

Location
Huron, Michigan
Technology
Petroleum Liquids
Owner / parent
DTE Energy
Operator
DTE Electric Company
Grid
MISO (Midcontinent)
Plant ID
1735

What stands out

1

Oliver is a 14 MW Petroleum Liquids asset in Michigan with status Operating.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $-119.7/MWh OpEx, $154/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
State rank
#6 of 22
National rank
#221 of 825

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.