Query
Oliver
Type
Entity Briefing
Entity
Oliver
Generated
2026-10-10T18:35:58.099Z

Briefing on Oliver

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
14 MW
Capacity
Operating
Current status
1970
Operating since
5
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

Oliver is a 14 MW Petroleum Liquids asset in MISO (Midcontinent), currently Operating.

Oliver is reported in Michigan since 1970 under DTE Energy. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $154/kW reported CapEx.

Location
Huron, Michigan
Technology
Petroleum Liquids
Owner / parent
DTE Energy
Operator
DTE Electric Company
Grid
MISO (Midcontinent)
Plant ID
1735

What stands out

1

Oliver is a 14 MW Petroleum Liquids asset in Michigan with status Operating.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $-119.7/MWh OpEx, $154/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
State rank
#6 of 22
National rank
#221 of 825

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.