Query
Old Fiddler Energy Storage
Type
Entity Briefing
Entity
Old Fiddler Energy Storage
Generated
2026-10-06T19:13:38.126Z

Briefing on Old Fiddler Energy Storage

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
224 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-04-16
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Old Fiddler Energy Storage is a 224 MW Battery project in Texas, currently active.

Old Fiddler Energy Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-16.

Queue ID
ERCOT-28INR0029
Location
Henderson, Texas
Technology
Battery
Developer
Old Fiddler Energy Storage LLC
Market / region
ERCOT
Point of interconnection
3233 Foggle Switch 138 kV

What stands out

1

Old Fiddler Energy Storage is a 224 MW Battery project in Texas with status active.

2

Old Fiddler Energy Storage LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-04-16.

Market and operating context

Queue date
2024-01-11
Proposed COD
2029-04-16
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Old Fiddler Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0029
LocationHenderson, Texas
TechnologyBattery
DeveloperOld Fiddler Energy Storage LLC
Market / regionERCOT
Point of interconnection3233 Foggle Switch 138 kV
Queue date2024-01-11
Proposed COD2029-04-16