Query
Old Cedar Solar Energy Storage
Type
Entity Briefing
Entity
Old Cedar Solar Energy Storage
Technology
solar
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Old Cedar Solar Energy Storage

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
2021
Operating since
2
Generators
8.8%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Old Cedar Solar Energy Storage is a 2 MW Batteries asset in North Carolina, currently Operating.

Old Cedar Solar Energy Storage is reported in North Carolina since 2021 under North Carolina El Member Corp. Available operating and financial measures include 8.8% capacity factor and 2 GWh annual generation; $20.5/MWh reported energy value.

Location
Randolph, North Carolina
Technology
Batteries, Solar Photovoltaic
Owner / parent
North Carolina El Member Corp
Operator
North Carolina El Member Corp
Grid
Duke Energy Progress East
Plant ID
64522

What stands out

1

Old Cedar Solar Energy Storage is a 2 MW Batteries asset in North Carolina with status Operating.

2

Latest annual operating measures report 8.8% capacity factor and 2 GWh annual generation.

3

Available financial measures include $20.5/MWh energy value.

Market and operating context

Balancing authority
Duke Energy Progress East
NERC region
SERC
State rank
#41 of 44
National rank
#916 of 994

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.