Query
Ohio Northern University Solar Site
Type
Entity Briefing
Entity
Ohio Northern University Solar Site
State
OH
Technology
solar
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Ohio Northern University Solar Site

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

3 MW
Capacity
Operating
Current status
2016
Operating since
2
Generators
15.0%
Capacity factor
4 GWh
Annual generation
Briefing/plantOperating

Ohio Northern University Solar Site is a 3 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.

Ohio Northern University Solar Site is reported in Ohio since 2016 under Onsite Partners, LLC. Available operating and financial measures include 15.0% capacity factor and 4 GWh annual generation; $32.4/MWh reported energy value.

Location
Hardin, Ohio
Technology
Solar Photovoltaic
Owner / parent
Onsite Partners, LLC
Operator
Onsite Partners, LLC
Grid
PJM Interconnection
Plant ID
60913

What stands out

1

Ohio Northern University Solar Site is a 3 MW Solar Photovoltaic asset in Ohio with status Operating.

2

Latest annual operating measures report 15.0% capacity factor and 4 GWh annual generation.

3

Available financial measures include $32.4/MWh energy value.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#67 of 92
National rank
#4636 of 7,971

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.