Query
OCI Hillsboro
Type
Entity Briefing
Entity
OCI Hillsboro
Generated
2026-10-16T00:58:22.981Z

Briefing on OCI Hillsboro

Entity Briefing
Generated Oct 16, 2026·Dataset freshness not reported
400 MW
Capacity
Planned
Current status
2
Generators
Briefing/plantPlanned

OCI Hillsboro is a 400 MW Batteries asset in ERCOT (Texas), currently Planned.

OCI Hillsboro is reported in Texas under HEC Renewable Energy America LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Hill, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
HEC Renewable Energy America LLC
Operator
HEC Renewable Energy America LLC
Grid
ERCOT (Texas)
Plant ID
66401

What stands out

1

OCI Hillsboro is a 400 MW Batteries asset in Texas with status Planned.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “Commissioners Approve Changes To OCI Hillsboro Solar Abatement” (KHBR Radio, 2026-02-05).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#18 of 344
National rank
#72 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

OCI Hillsboro — verified asset snapshot

FieldValue
LocationHill, Texas
TechnologyBatteries, Solar Photovoltaic
Owner / parentHEC Renewable Energy America LLC
OperatorHEC Renewable Energy America LLC
GridERCOT (Texas)
Plant ID66401
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.