Query
OCI Alamo 5 LLC
Type
Entity Briefing
Entity
OCI Alamo 5 LLC
Summary generated
Oct 11, 2026
First saved
Date not recorded

Briefing on OCI Alamo 5 LLC

Entity Briefing

Summary generated Oct 11, 2026 (UTC).

Source dates used by this summary were not recorded.

100 MW
Capacity
Operating
Current status
2015
Operating since
1
Generators
21.2%
Capacity factor
186 GWh
Annual generation
Briefing/plantOperating

OCI Alamo 5 LLC is a 100 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

OCI Alamo 5 LLC is reported in Texas since 2015 under RWE Clean Energy. Available operating and financial measures include 21.2% capacity factor and 186 GWh annual generation; $22.1/MWh reported energy value.

Location
Uvalde, Texas
Technology
Solar Photovoltaic
Owner / parent
RWE Clean Energy
Operator
RWE Clean Energy
Grid
ERCOT (Texas)
Plant ID
59205

What stands out

1

OCI Alamo 5 LLC is a 100 MW Solar Photovoltaic asset in Texas with status Operating.

2

Latest annual operating measures report 21.2% capacity factor and 186 GWh annual generation.

3

Available financial measures include $22.1/MWh energy value.

4

Latest linked story: “OCI Solar Power Sells 110 MW Solar Project to Mitsui” (Mercom Capital Group, 2023-04-25).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#255 of 378
National rank
#796 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.