Briefing on Ochoa Energy Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
260 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-06-03
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Ochoa Energy Storage is a 260 MW Battery project in Texas, currently active.

Ochoa Energy Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-03.

Queue ID
ERCOT-26INR0114
Location
Waller, Texas
Technology
Battery
Developer
Ochoa Energy Storage LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV Katy (44420) - Franz (44260) Ckt 09

What stands out

1

Ochoa Energy Storage is a 260 MW Battery project in Texas with status active.

2

Ochoa Energy Storage LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-06-03.

4

Latest linked story: “Katy homeowners stopped a battery project, now the developer wants the state to overrule them” (Click2Houston, 2025-11-19).

Market and operating context

Queue date
2023-04-19
Proposed COD
2027-06-03
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Ochoa Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0114
LocationWaller, Texas
TechnologyBattery
DeveloperOchoa Energy Storage LLC
Market / regionERCOT
Point of interconnectionTap 138kV Katy (44420) - Franz (44260) Ckt 09
Queue date2023-04-19
Proposed COD2027-06-03