Ochoa Energy Storage is a 260 MW Battery project in Texas, currently active.
Ochoa Energy Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-03.
- Queue ID
- ERCOT-26INR0114
- Location
- Waller, Texas
- Technology
- Battery
- Developer
- Ochoa Energy Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV Katy (44420) - Franz (44260) Ckt 09
What stands out
Ochoa Energy Storage is a 260 MW Battery project in Texas with status active.
Ochoa Energy Storage LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-06-03.
Latest linked story: “Katy homeowners stopped a battery project, now the developer wants the state to overrule them” (Click2Houston, 2025-11-19).
Market and operating context
- Queue date
- 2023-04-19
- Proposed COD
- 2027-06-03
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.