Query
Oberon II Solar Project
Type
Entity Briefing
Entity
Oberon II Solar Project
Generated
2026-10-19T11:49:35.013Z

Briefing on Oberon II Solar Project

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
375 MW
Capacity
Operating
Current status
2023
Operating since
2
Generators
17.9%
Capacity factor
590 GWh
Annual generation
Briefing/plantOperating

Oberon II Solar Project is a 375 MW Batteries asset in CAISO (California), currently Operating.

Oberon II Solar Project is reported in California since 2023 under Intersect USA, LLC. Available operating and financial measures include 17.9% capacity factor and 590 GWh annual generation; $6.5/MWh reported energy value.

Location
Riverside, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Intersect USA, LLC
Operator
Intersect USA, LLC
Grid
CAISO (California)
Plant ID
65735

What stands out

1

Oberon II Solar Project is a 375 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 17.9% capacity factor and 590 GWh annual generation.

3

Available financial measures include $6.5/MWh energy value.

4

Latest linked story: “Google, Intersect Power to develop energy parks with $20B of renewables, storage” (ESG Dive, 2024-12-11).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#18 of 992
National rank
#95 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.