Briefing on NY125A - Fort Covington Solar

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
250 MW
Proposed capacity
active
Current status
Solar
Technology
NYISO
Market / region
2028-07-01
Proposed COD
System Impact Study
Queue phase
Briefing/projectactive

NY125A - Fort Covington Solar is a 250 MW Solar project in New York, currently active.

Fort Covington Solar LLC is the reported developer. The reported queue phase is System Impact Study. Proposed COD is 2028-07-01.

Queue ID
NYISO-1183
Location
Franklin, New York
Technology
Solar
Developer
Fort Covington Solar LLC
Market / region
NYISO
Point of interconnection
Moses-Willis 230 kV (MW1)

What stands out

1

NY125A - Fort Covington Solar is a 250 MW Solar project in New York with status active.

2

Fort Covington Solar LLC is the reported developer.

3

The reported queue phase is System Impact Study; proposed COD is 2028-07-01.

Market and operating context

Queue date
2021-05-20
Proposed COD
2028-07-01
IA status
System Impact Study
Study phase
System Impact Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

NY125A - Fort Covington Solar — verified asset snapshot

FieldValue
Queue IDNYISO-1183
LocationFranklin, New York
TechnologySolar
DeveloperFort Covington Solar LLC
Market / regionNYISO
Point of interconnectionMoses-Willis 230 kV (MW1)
Queue date2021-05-20
Proposed COD2028-07-01