Briefing on Nouveau BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
256 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Nouveau BESS is a 256 MW Battery project in Texas, currently active.

RamZ BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-15.

Queue ID
ERCOT-27INR0291
Location
Brown, Texas
Technology
Battery
Developer
RamZ BESS, LLC
Market / region
ERCOT
Point of interconnection
1444 Brown Switch - 3348 Russell Gap 345 kV Line

What stands out

1

Nouveau BESS is a 256 MW Battery project in Texas with status active.

2

RamZ BESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-15.

Market and operating context

Queue date
2024-08-16
Proposed COD
2027-12-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Nouveau BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0291
LocationBrown, Texas
TechnologyBattery
DeveloperRamZ BESS, LLC
Market / regionERCOT
Point of interconnection1444 Brown Switch - 3348 Russell Gap 345 kV Line
Queue date2024-08-16
Proposed COD2027-12-15