North Kern State Prison Phase II is a 4 MW Solar Photovoltaic asset in CAISO (California), currently Operating.
North Kern State Prison Phase II is reported in California since 2012 under SunE P11L Holdings, LLC. Available operating and financial measures include 18.5% capacity factor and 6 GWh annual generation; $12.2/MWh reported energy value.
- Location
- Kern, California
- Technology
- Solar Photovoltaic
- Owner / parent
- SunE P11L Holdings, LLC
- Operator
- SunE P11L Holdings, LLC
- Grid
- CAISO (California)
- Plant ID
- 63651
What stands out
North Kern State Prison Phase II is a 4 MW Solar Photovoltaic asset in California with status Operating.
Latest annual operating measures report 18.5% capacity factor and 6 GWh annual generation.
Available financial measures include $12.2/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #426 of 992
- National rank
- #4036 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.