Query
North Edinburg BESS 1
Type
Entity Briefing
Entity
North Edinburg BESS 1
State
NC
Technology
battery
Generated
2026-10-17T13:17:18.020Z

Briefing on North Edinburg BESS 1

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
10 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

North Edinburg BESS 1 is a 10 MW Batteries asset in ERCOT (Texas), currently Under construction.

North Edinburg BESS 1 is reported in Texas under Edinburg ESS Assets LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Hidalgo, Texas
Technology
Batteries
Owner / parent
Edinburg ESS Assets LLC
Operator
Edinburg ESS Assets LLC
Grid
ERCOT (Texas)
Plant ID
69253

What stands out

1

North Edinburg BESS 1 is a 10 MW Batteries asset in Texas with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

1 linked queue projects represent 10 MW of proposed capacity.

Market and operating context

ISO / market
ERCOT (Texas)
State rank
#235 of 344
National rank
#611 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

North Edinburg BESS 1 — verified asset snapshot

FieldValue
LocationHidalgo, Texas
TechnologyBatteries
Owner / parentEdinburg ESS Assets LLC
OperatorEdinburg ESS Assets LLC
GridERCOT (Texas)
Plant ID69253
ISO / marketERCOT (Texas)
State rank#235 of 344