Query
North Allegheny Windpower Project
Type
Entity Briefing
Entity
North Allegheny Windpower Project
State
NC
Technology
wind
Generated
2026-10-17T08:09:03.665Z

Briefing on North Allegheny Windpower Project

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
75 MW
Capacity
Operating
Current status
2009
Operating since
1
Generators
33.2%
Capacity factor
218 GWh
Annual generation
Briefing/plantOperating

North Allegheny Windpower Project is a 75 MW Onshore Wind Turbine asset in PJM Interconnection, currently Operating.

North Allegheny Windpower Project is reported in Pennsylvania since 2009 under Duke Energy. Available operating and financial measures include 33.2% capacity factor and 218 GWh annual generation; $1895/kW reported CapEx.

Location
Blair, Pennsylvania
Technology
Onshore Wind Turbine
Owner / parent
Duke Energy
Operator
Duke Energy Renewables Services
Grid
PJM Interconnection
Plant ID
56651

What stands out

1

North Allegheny Windpower Project is a 75 MW Onshore Wind Turbine asset in Pennsylvania with status Operating.

2

Latest annual operating measures report 33.2% capacity factor and 218 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

4

Latest linked story: “Deriva Energy Announces Its First Energy Project to Close with IRA Bonus Credits” (PR Newswire, 2024-08-22).

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#9 of 28
National rank
#855 of 1,442

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.