Briefing/projectactive
NOOSA ENERGY STORAGE is a 99 MW Battery project in California, currently active.
The reported queue phase is C12. Proposed COD is 2029-04-16.
- Queue ID
- CAISO-1557
- Location
- San Joaquin, California
- Technology
- Battery
- Market / region
- CAISO
- Point of interconnection
- Ripon 115 kV
What stands out
1
NOOSA ENERGY STORAGE is a 99 MW Battery project in California with status active.
2
The reported queue phase is C12; proposed COD is 2029-04-16.
Market and operating context
- Queue date
- 2019-04-15
- Proposed COD
- 2029-04-16
- IA status
- IA Executed
- Study phase
- C12
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.