Query
Non-PLD US-El Paso - BSSAT004
Type
Entity Briefing
Entity
Non-PLD US-El Paso - BSSAT004
Generated
2026-10-20T00:03:09.293Z

Briefing on Non-PLD US-El Paso - BSSAT004

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
10 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Non-PLD US-El Paso - BSSAT004 is a 10 MW Batteries asset in ERCOT (Texas), currently Operating.

Non-PLD US-El Paso - BSSAT004 is reported in Texas since 2025 under Prologis Logistics Services Incorporated BESS. Available operating and financial measures include $1361/kW reported CapEx.

Location
Ector, Texas
Technology
Batteries
Owner / parent
Prologis Logistics Services Incorporated BESS
Operator
Prologis Logistics Services Incorporated BESS
Grid
ERCOT (Texas)
Plant ID
69576

What stands out

1

Non-PLD US-El Paso - BSSAT004 is a 10 MW Batteries asset in Texas with status Operating.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
State rank
#305 of 344
National rank
#738 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Non-PLD US-El Paso - BSSAT004 — verified asset snapshot

FieldValue
LocationEctor, Texas
TechnologyBatteries
Owner / parentPrologis Logistics Services Incorporated BESS
OperatorPrologis Logistics Services Incorporated BESS
GridERCOT (Texas)
Plant ID69576
ISO / marketERCOT (Texas)
State rank#305 of 344