Briefing on Nockenut Springs Solar 5

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-06-05
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Nockenut Springs Solar 5 is a 201 MW Solar project in Texas, currently active.

Pecan Springs Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-05.

Queue ID
ERCOT-25INR0280
Location
Gonzales, Texas
Technology
Solar
Developer
Pecan Springs Energy, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 5133 Elm Creek - 5915 South Texas Project

What stands out

1

Nockenut Springs Solar 5 is a 201 MW Solar project in Texas with status active.

2

Pecan Springs Energy, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-06-05.

Market and operating context

Queue date
2023-02-09
Proposed COD
2029-06-05
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Nockenut Springs Solar 5 — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0280
LocationGonzales, Texas
TechnologySolar
DeveloperPecan Springs Energy, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 5133 Elm Creek - 5915 South Texas Project
Queue date2023-02-09