Nobles Wind Project is a 201 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Operating.
Nobles Wind Project is reported in Minnesota since 2010 under Northern States Power Co - Minnesota. Available operating and financial measures include 46.8% capacity factor and 823 GWh annual generation; $1389/kW reported CapEx.
- Location
- Nobles, Minnesota
- Technology
- Onshore Wind Turbine
- Owner / parent
- Northern States Power Co - Minnesota
- Operator
- Northern States Power Co - Minnesota
- Grid
- MISO (Midcontinent)
- Plant ID
- 57047
What stands out
Nobles Wind Project is a 201 MW Onshore Wind Turbine asset in Minnesota with status Operating.
Latest annual operating measures report 46.8% capacity factor and 823 GWh annual generation.
Available financial measures include $6.8/MWh OpEx, $1389/kW CapEx.
Latest linked story: “Geronimo Power's Farmer-Friendly and Community First Approach Receives Warm Welcome from Minnesota's Nobles County Community” (Morningstar, 2026-02-28).
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #8 of 123
- National rank
- #297 of 1,442
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.