Briefing/plantOperating
Niagara is a 4 MW Conventional Hydroelectric asset in PJM Interconnection, currently Operating.
Niagara is reported in Virginia since 1954 under American Electric Power Company. Available operating and financial measures include 24.1% capacity factor and 8 GWh annual generation.
- Location
- Roanoke, Virginia
- Technology
- Conventional Hydroelectric
- Owner / parent
- American Electric Power Company
- Operator
- Appalachian Power Co
- Grid
- PJM Interconnection
- Plant ID
- 3778
What stands out
1
Niagara is a 4 MW Conventional Hydroelectric asset in Virginia with status Operating.
2
Latest annual operating measures report 24.1% capacity factor and 8 GWh annual generation.
3
Available financial measures include $43.6/MWh OpEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #15 of 24
- National rank
- #1002 of 1,462
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.