Query
Nexamp Peak CSG
Type
Entity Briefing
Entity
Nexamp
Generated
2026-10-17T20:17:27.052Z

Briefing on Nexamp

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
2
Operating plants
7 MW
Operating capacity
1
States
2
Queue projects
80 MW
Queue capacity
Solar
Leading technology
Briefing/owner2 operating assets · 2 queue projects

Nexamp includes 7 MW of operating capacity and 80 MW of proposed queue capacity in the current result.

2 operating plants span 1 states. The linked queue contains 2 projects totaling 80 MW. Solar is the largest operating technology group at 7 MW.

Coverage
2 plants across 1 states
Largest asset
Upper Blackstone (MA) Treasure Valley · 5 MW
Leading technology
Solar · 7 MW
Queue pipeline
2 projects · 80 MW

What stands out

1

2 operating plants total 7 MW across 1 states.

2

Solar is the largest operating technology group at 7 MW across 2 plants.

3

Upper Blackstone (MA) Treasure Valley is the largest returned operating asset at 5 MW.

4

2 queue projects total 80 MW of proposed capacity.

Market and operating context

Largest state footprint
Massachusetts · 7 MW
Technology concentration
Solar represents 7 MW
Development pipeline
2 projects · 80 MW

Why it matters

The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.

Nexamp — largest operating assets

PlantStateTechnologyCapacityStatus
Upper Blackstone (MA) Treasure ValleyMASUN5 MWOperating
Nexamp Peak CSGMASUN2 MWOperating