Query
New Rosewood BESS
Type
Entity Briefing
Entity
New Rosewood BESS
ISO/RTO
isone
Technology
battery
Generated
2026-10-18T00:58:46.893Z

Briefing on New Rosewood BESS

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
-1.0%
Capacity factor
-0 GWh
Annual generation
Briefing/plantOperating

New Rosewood BESS is a 3 MW Batteries asset in North Carolina, currently Operating.

New Rosewood BESS is reported in North Carolina since 2024 under North Carolina El Member Corp. Available operating and financial measures include -1.0% capacity factor and -0 GWh annual generation; $1361/kW reported CapEx.

Location
Wayne, North Carolina
Technology
Batteries
Owner / parent
North Carolina El Member Corp
Operator
North Carolina El Member Corp
Grid
Duke Energy Progress East
Plant ID
65243

What stands out

1

New Rosewood BESS is a 3 MW Batteries asset in North Carolina with status Operating.

2

Latest annual operating measures report -1.0% capacity factor and -0 GWh annual generation.

3

Available financial measures include $1361/kW CapEx.

Market and operating context

Balancing authority
Duke Energy Progress East
NERC region
SERC
State rank
#37 of 44
National rank
#912 of 994

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.