Query
New Lahontan
Type
Entity Briefing
Entity
New Lahontan
ISO/RTO
isone
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on New Lahontan

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

4 MW
Capacity
Operating
Current status
1989
Operating since
1
Generators
28.7%
Capacity factor
10 GWh
Annual generation
Briefing/plantOperating

New Lahontan is a 4 MW Conventional Hydroelectric asset in Nevada, currently Operating.

New Lahontan is reported in Nevada since 1989 under Truckee-Carson Irrigation District. Available operating and financial measures include 28.7% capacity factor and 10 GWh annual generation; $2294/kW reported CapEx.

Location
Churchill, Nevada
Technology
Conventional Hydroelectric
Owner / parent
Truckee-Carson Irrigation District
Operator
Truckee-Carson Irrigation District
Grid
Nevada Power Company
Plant ID
50261

What stands out

1

New Lahontan is a 4 MW Conventional Hydroelectric asset in Nevada with status Operating.

2

Latest annual operating measures report 28.7% capacity factor and 10 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

Balancing authority
Nevada Power Company
NERC region
WECC
State rank
#2 of 6
National rank
#958 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.