Query
Neal Shoals
Type
Entity Briefing
Entity
Neal Shoals
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Neal Shoals

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

4 MW
Capacity
Operating
Current status
1905
Operating since
4
Generators
30.3%
Capacity factor
12 GWh
Annual generation
Briefing/plantOperating

Neal Shoals is a 4 MW Conventional Hydroelectric asset in South Carolina, currently Operating.

Neal Shoals is reported in South Carolina since 1905 under Dominion Energy. Available operating and financial measures include 30.3% capacity factor and 12 GWh annual generation; $1/kW reported CapEx.

Location
Union, South Carolina
Technology
Conventional Hydroelectric
Owner / parent
Dominion Energy
Operator
Dominion Energy South Carolina, Inc
Grid
Dominion Energy South Carolina
Plant ID
3289

What stands out

1

Neal Shoals is a 4 MW Conventional Hydroelectric asset in South Carolina with status Operating.

2

Latest annual operating measures report 30.3% capacity factor and 12 GWh annual generation.

3

Available financial measures include $34.0/MWh OpEx, $1/kW CapEx.

4

Latest linked story: “Dominion Energy South Carolina, Inc.; Notice of Application for Amendment to Turbine Venting Plan and Article 401(B) In Part Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests” (Federal Register (FERC), 2026-07-06).

Market and operating context

Balancing authority
Dominion Energy South Carolina
NERC region
SERC
State rank
#21 of 32
National rank
#926 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.