Briefing on Neal Battery

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
121 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-04-03
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Neal Battery is a 121 MW Solar+Battery project in Texas, currently active.

CH Neal Battery LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-03.

Queue ID
ERCOT-28INR0452
Location
Wharton, Texas
Technology
Solar+Battery
Developer
CH Neal Battery LLC
Market / region
ERCOT
Point of interconnection
tap of 138kV 8750 CHARMERP4A - 8127 South Lane City

What stands out

1

Neal Battery is a 121 MW Solar+Battery project in Texas with status active.

2

CH Neal Battery LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-04-03.

4

Latest linked story: “North Carolina OKs Duke Energy plan to add 3.6 GW gas-fired capacity, 7 GW renewables” (Utility Dive, 2024-11-05).

Market and operating context

Queue date
2025-10-21
Proposed COD
2029-04-03
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Neal Battery — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0452
LocationWharton, Texas
TechnologySolar+Battery
DeveloperCH Neal Battery LLC
Market / regionERCOT
Point of interconnectiontap of 138kV 8750 CHARMERP4A - 8127 South Lane City
Queue date2025-10-21
Proposed COD2029-04-03