Briefing on NCS Paradise LLC

Entity Briefing

Summary generated Oct 1, 2026 (UTC).

Source dates used by this summary were not recorded.

1 MW
Capacity
Operating
Current status
2021
Operating since
1
Generators
14.4%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

NCS Paradise LLC is a 1 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.

NCS Paradise LLC is reported in District of Columbia since 2021 under New Columbia Solar. Available operating and financial measures include 14.4% capacity factor and 2 GWh annual generation; $39.1/MWh reported energy value.

Location
District of Columbia, District of Columbia
Technology
Solar Photovoltaic
Owner / parent
New Columbia Solar
Operator
New Columbia Solar
Grid
PJM Interconnection
Plant ID
68280

What stands out

1

NCS Paradise LLC is a 1 MW Solar Photovoltaic asset in District of Columbia with status Operating.

2

Latest annual operating measures report 14.4% capacity factor and 2 GWh annual generation.

3

Available financial measures include $39.1/MWh energy value.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#11 of 17
National rank
#6901 of 7,971

Why it matters