3 MW
Capacity
Out of service
Current status
2013
Operating since
2
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOut of service

Napoleon Biogas is a 3 MW Other Waste Biomass asset in PJM Interconnection, currently Out of service.

Napoleon Biogas is reported in Ohio since 2013 under CH4 Biogas LLC. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $3495/kW reported CapEx.

Location
Henry, Ohio
Technology
Other Waste Biomass
Owner / parent
CH4 Biogas LLC
Operator
CH4 Biogas LLC
Grid
PJM Interconnection
Plant ID
58921

What stands out

1

Napoleon Biogas is a 3 MW Other Waste Biomass asset in Ohio with status Out of service.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $3495/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#1 of 4
National rank
#32 of 71

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.