Nabla Energy Storage I
Type
Entity Briefing
Entity
Nabla Energy Storage I
Generated
2026-10-19T21:35:56.407Z

Briefing on Nabla Energy Storage I

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
750 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-09-17
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Nabla Energy Storage I is a 750 MW Battery project in Texas, currently active.

Nabla Park LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-17.

Queue ID
ERCOT-27INR0571
Location
Tarrant, Texas
Technology
Battery
Developer
Nabla Park LLC
Market / region
ERCOT
Point of interconnection
tapping on 345 kV Line PARKER_5 ‚Äé1436 to BENBRK_5 ‚Äé1873

What stands out

1

Nabla Energy Storage I is a 750 MW Battery project in Texas with status active.

2

Nabla Park LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-09-17.

Market and operating context

Queue date
2025-11-05
Proposed COD
2029-09-17
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Nabla Energy Storage I — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0571
LocationTarrant, Texas
TechnologyBattery
DeveloperNabla Park LLC
Market / regionERCOT
Point of interconnectiontapping on 345 kV Line PARKER_5 ‚Äé1436 to BENBRK_5 ‚Äé1873
Queue date2025-11-05
Proposed COD2029-09-17