Query
Mustang Two
Type
Entity Briefing
Entity
Mustang Two
Generated
2026-10-17T08:40:42.307Z

Briefing on Mustang Two

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
150 MW
Capacity
Operating
Current status
2020
Operating since
2
Generators
30.1%
Capacity factor
396 GWh
Annual generation
Briefing/plantOperating

Mustang Two is a 150 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Mustang Two is reported in California since 2020 under Idemitsu Kosan. Available operating and financial measures include 30.1% capacity factor and 396 GWh annual generation; $4.6/MWh reported energy value.

Location
Kings, California
Technology
Solar Photovoltaic
Owner / parent
Idemitsu Kosan
Operator
RE Mustang Two LLC
Grid
CAISO (California)
Plant ID
62015

What stands out

1

Mustang Two is a 150 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 30.1% capacity factor and 396 GWh annual generation.

3

Available financial measures include $4.6/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#86 of 992
National rank
#554 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.