MULQUEENEY RANCH WIND Wind queue pipeline — 1 projects by technology and status
Type
Entity Briefing
Entity
Miracle Ranch BESS SLF
ISO/RTO
isone
Technology
wind
Generated
2026-10-10T22:08:04.882Z

Briefing on Miracle Ranch BESS SLF

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
active
Current status
Battery
Technology
ERCOT
Market / region
2028-06-30
Proposed COD
Briefing/projectactive

Miracle Ranch BESS SLF is a 0 MW Battery project in Texas, currently active.

Miracle Ranch LLC is the reported developer. Proposed COD is 2028-06-30.

Queue ID
ERCOT-28INR0273
Location
Webb, Texas
Technology
Battery
Developer
Miracle Ranch LLC
Market / region
ERCOT
Point of interconnection
138kV North Laredo (8909_NLARSW4A) to Barrera (8717_BARRERA4A) - AEP

What stands out

1

Miracle Ranch BESS SLF is a 0 MW Battery project in Texas with status active.

2

Miracle Ranch LLC is the reported developer.

3

proposed COD is 2028-06-30.

Market and operating context

Queue date
2025-03-19
Proposed COD
2028-06-30

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Miracle Ranch BESS SLF — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0273
LocationWebb, Texas
TechnologyBattery
DeveloperMiracle Ranch LLC
Market / regionERCOT
Point of interconnection138kV North Laredo (8909_NLARSW4A) to Barrera (8717_BARRERA4A) - AEP
Queue date2025-03-19
Proposed COD2028-06-30