Briefing on MRG Goody Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
52 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2026-03-20
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

MRG Goody Storage is a 52 MW Solar+Battery project in Texas, currently active.

MRG Goody Solar Project LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-03-20.

Queue ID
ERCOT-24INR0305
Location
Lamar, Texas
Technology
Solar+Battery
Developer
MRG Goody Solar Project LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693)

What stands out

1

MRG Goody Storage is a 52 MW Solar+Battery project in Texas with status active.

2

MRG Goody Solar Project LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-03-20.

Market and operating context

Queue date
2022-05-10
Proposed COD
2026-03-20
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

MRG Goody Storage — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0305
LocationLamar, Texas
TechnologySolar+Battery
DeveloperMRG Goody Solar Project LLC
Market / regionERCOT
Point of interconnectionTap 138 kV Toco Switch (#1700) – Paris Switch (#1693)
Queue date2022-05-10
Proposed COD2026-03-20