Query
Mount Olive Solar Farm
Type
Entity Briefing
Entity
Mount Olive Solar Farm
State
MT
Technology
solar
Generated
2026-10-05T04:53:53.253Z

Briefing on Mount Olive Solar Farm

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
20 MW
Capacity
Operating
Current status
2023
Operating since
1
Generators
18.5%
Capacity factor
32 GWh
Annual generation
Briefing/plantOperating

Mount Olive Solar Farm is a 20 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.

Mount Olive Solar Farm is reported in New Jersey since 2023 under NJR Clean Energy Ventures Corporation. Available operating and financial measures include 18.5% capacity factor and 32 GWh annual generation; $28.2/MWh reported energy value.

Location
Morris, New Jersey
Technology
Solar Photovoltaic
Owner / parent
NJR Clean Energy Ventures Corporation
Operator
NJR Clean Energy Ventures Corporation
Grid
PJM Interconnection
Plant ID
65348

What stands out

1

Mount Olive Solar Farm is a 20 MW Solar Photovoltaic asset in New Jersey with status Operating.

2

Latest annual operating measures report 18.5% capacity factor and 32 GWh annual generation.

3

Available financial measures include $28.2/MWh energy value.

4

Latest linked story: “A solar solution” (Waste Today -, 2024-07-29).

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#4 of 356
National rank
#1893 of 7,971

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.