Briefing/projectactive
Morrow Lake Storage is a 201 MW Solar+Battery project in Texas, currently active.
Morrow Lake Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-02-10.
- Queue ID
- ERCOT-21INR0483
- Location
- Frio, Texas
- Technology
- Solar+Battery
- Developer
- Morrow Lake Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- Morrow Lake Switch 138kV (5896)
What stands out
1
Morrow Lake Storage is a 201 MW Solar+Battery project in Texas with status active.
2
Morrow Lake Storage, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2026-02-10.
Market and operating context
- Queue date
- 2020-02-07
- Proposed COD
- 2026-02-10
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.