Moonlight Sonata BESS
Type
Entity Briefing
Entity
Moonlight Sonata BESS
State
TN
Technology
battery
Generated
2026-10-20T02:24:12.412Z

Briefing on Moonlight Sonata BESS

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Moonlight Sonata BESS is a 201 MW Battery project in Texas, currently active.

Samsung Solar Energy 2, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.

Queue ID
ERCOT-25INR0186
Location
Colorado, Texas
Technology
Battery
Developer
Samsung Solar Energy 2, LLC
Market / region
ERCOT
Point of interconnection
Altair (78118) – Nada (78103) 138KV

What stands out

1

Moonlight Sonata BESS is a 201 MW Battery project in Texas with status active.

2

Samsung Solar Energy 2, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-01.

Market and operating context

Queue date
2022-09-27
Proposed COD
2028-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Moonlight Sonata BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0186
LocationColorado, Texas
TechnologyBattery
DeveloperSamsung Solar Energy 2, LLC
Market / regionERCOT
Point of interconnectionAltair (78118) – Nada (78103) 138KV
Queue date2022-09-27
Proposed COD2028-07-01