Query
Monterey Regional Water Pollution Contro
Type
Entity Briefing
Entity
Monterey Regional Water Pollution Contro
Generated
2026-10-12T12:06:59.836Z

Briefing on Monterey Regional Water Pollution Contro

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2010
Operating since
1
Generators
14.0%
Capacity factor
1 GWh
Annual generation
Briefing/plantOperating

Monterey Regional Water Pollution Contro is a 1 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Monterey Regional Water Pollution Contro is reported in California since 2010 under Tesla Inc.. Available operating and financial measures include 14.0% capacity factor and 1 GWh annual generation; $37.3/MWh reported energy value.

Location
Monterey, California
Technology
Solar Photovoltaic
Owner / parent
Tesla Inc.
Operator
Tesla Inc.
Grid
CAISO (California)
Plant ID
58633

What stands out

1

Monterey Regional Water Pollution Contro is a 1 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 14.0% capacity factor and 1 GWh annual generation.

3

Available financial measures include $37.3/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#932 of 992
National rank
#7572 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.