Briefing/projectactive
Jenna Eco-Electric Solar is a 576 MW Solar project in Texas, currently active.
Clean Energy Holdings, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-21.
- Queue ID
- ERCOT-25INR0632
- Location
- Fisher, Texas
- Technology
- Solar
- Developer
- Clean Energy Holdings, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 1048 Tonkawa Switch - 1430 Graham SES
What stands out
1
Jenna Eco-Electric Solar is a 576 MW Solar project in Texas with status active.
2
Clean Energy Holdings, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-21.
Market and operating context
- Queue date
- 2024-05-20
- Proposed COD
- 2028-09-21
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.