Query
Mohave Electric at Fort Mohave
Type
Entity Briefing
Entity
Jenna Eco-Electric Solar
State
CA
Generated
2026-10-10T12:20:05.109Z

Briefing on Jenna Eco-Electric Solar

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
576 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-09-21
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Jenna Eco-Electric Solar is a 576 MW Solar project in Texas, currently active.

Clean Energy Holdings, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-21.

Queue ID
ERCOT-25INR0632
Location
Fisher, Texas
Technology
Solar
Developer
Clean Energy Holdings, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 1048 Tonkawa Switch - 1430 Graham SES

What stands out

1

Jenna Eco-Electric Solar is a 576 MW Solar project in Texas with status active.

2

Clean Energy Holdings, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-21.

Market and operating context

Queue date
2024-05-20
Proposed COD
2028-09-21
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Jenna Eco-Electric Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0632
LocationFisher, Texas
TechnologySolar
DeveloperClean Energy Holdings, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 1048 Tonkawa Switch - 1430 Graham SES
Queue date2024-05-20
Proposed COD2028-09-21