Briefing on Mobee Springs BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-03-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Mobee Springs BESS is a 101 MW Battery project in Texas, currently active.

Mobee Springs, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-03-31.

Queue ID
ERCOT-28INR0175
Location
Refugio, Texas
Technology
Battery
Developer
Mobee Springs, LLC
Market / region
ERCOT
Point of interconnection
#8805 BONIVIEW2A 69kV

What stands out

1

Mobee Springs BESS is a 101 MW Battery project in Texas with status active.

2

Mobee Springs, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-03-31.

Market and operating context

Queue date
2025-06-05
Proposed COD
2028-03-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Mobee Springs BESS — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0175
LocationRefugio, Texas
TechnologyBattery
DeveloperMobee Springs, LLC
Market / regionERCOT
Point of interconnection#8805 BONIVIEW2A 69kV
Queue date2025-06-05
Proposed COD2028-03-31