Briefing/projectactive
Mistflower Energy Center Solar is a 402 MW Solar project in Texas, currently active.
Mistflower Energy Center LLC is the reported developer. Proposed COD is 2030-06-01.
- Queue ID
- ERCOT-30INR0088
- Location
- Runnels, Texas
- Technology
- Solar
- Developer
- Mistflower Energy Center LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 60072 ODYSSEUS7A– 60040 BLF_CRK7A
What stands out
1
Mistflower Energy Center Solar is a 402 MW Solar project in Texas with status active.
2
Mistflower Energy Center LLC is the reported developer.
3
proposed COD is 2030-06-01.
Market and operating context
- Queue date
- 2026-02-25
- Proposed COD
- 2030-06-01
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.